Homerogz-purple-chrome-long-lead
JellyBean
HL01
SMALL
Yorkie, Pom, Maltese, Miniature Poodle, Chihuahua
Scooter
HL+HLL12
MEDIUM
Pug, Scotty, Jack Russel, Maltese Poodle, Terrier
Beach Bum
HL+HLL03
LARGE
Dalmation, Spaniel, Doberman, Boxer
Armed Response
HL+HLL02
X-LARGE
Rottweiler, Bouvier, Ridgeback, Labrador
Special Agent
HL04
XX-LARGE
German Shephard, Bulldog, Bouvier, St. Bernard
A wide range of cool graphic ribbons are stitched onto high grade webbing, ensuring your dog sports the latest and greatest.
Custom designed die cast ring (no welding). Electroplated chrome for a tarnish free finish.
SPECIFICATIONS
Acetyl Plastic Components, Zinc DieCast Components, Reflective Stitching, Nylon Webbing
Dimensions
| Size | Width of Webbing | Length | |
| JellyBean | SMALL | 1.1 cm | 3/8" | 1.8m | 71" |
| Scooter | MEDIUM | 1.6 cm | 5/8" | 1.8m | 71" |
| Beach Bum | LARGE | 2 cm | 3/4" | 1.8m | 71" |
| Armed Response | X-LARGE | 2.5 cm | 1" | 1.8m | 71" |
| Special Agent | XX-LARGE | 4 cm | 1 5/8" | 0,5m I 20" |


